Land Development FY24 Fee Schedule – With the exceptions noted on the table below, the BOCS approved a 3.0% across-the-board increase to the fee schedule. The increase will support the following fee-based activities: Rezoning and Special Use Permit Applications (SUPs), Site and Subdivision Plans, Geotechnical Studies, Floodplain, Resource Protection Area Studies, Site Development Bond Administration and Permits, and Lot Grading Plan Reviews.
Land Development Fee Schedule
Fee Type |
FY23 Adopted Fee |
FY24 |
Home Occupation Certificate - Family Day Home |
$93 |
$102 |
Home Occupation Certificate Appeal |
$307 |
$337 |
Variance to the Board of Zoning Appeals |
$504 |
$554 |
Re-Advertisement/Re-Notification (standard case) |
$63 |
$69 |
Re-Advertisement/Re-Notification (expanded notification area) |
$128 |
$140 |
Re-Posting/Replacement Sign (of 10 or more signs) |
$85 |
$93 |
Appeal to the Board of Zoning Appeals (BZA)/Board of County Supervisors (BOCS) |
$750 |
$825 |
Non-conforming Lot or Structure |
$128 |
$140 |
Non-conforming Use |
|
|
New Certification |
$215 |
$236 |
Re-Certification applied for in less than or equal to two years from last certification date |
$62 |
$68 |
Re-Certification applied for more than two years from last certification date |
$114 |
$125 |
Zoning/Proffer/Special Use Permit - Determination or Interpretation |
$478 |
$525 |
Zoning Verification (submitted by other than the homeowner) (DMV, DEQ, HUD) |
$93 |
$102 |
11. Fire Lane Plan Review |
$303.41 |
$327.68 |
12. Fire Lane Plan Inspection |
$246.99 |
$266.75 |
Part V - Nonresidential Subdivision/Site Plan Review Fees |
|
|
OR no proposed building(s) Percentage of total bond or escrow whichever is higher for up to the first $2M |
0.0% |
0.15% |
Percentage of total bond or escrow whichever is higher for over $2M |
0.0% |
0.01% |
Note: The higher of the two calculations is required to be used for the calculation of the supplemental fee. |
|
|
Site Development/Site Preparation Permit Fees |
|
|
Nonresidential Site Plan OR no proposed building(s) Percentage of total bond or escrow whichever is higher for up to the first $2M |
0.0% |
0.15% |
Percentage of total bond or escrow whichever is higher for over $2M |
0.0% |
0.01% |
Note: The higher of the two calculations is required to be used for the calculation of the supplemental fee. |
|
|
FY23 Adopted |
FY24 Adopted |
Part IX - Miscellaneous Fees |
|
Camera Van Inspections |
CCTV Storm Sewer / Underdrain Inspections |
Camera Van Re-Inspections |
CCTV Storm Sewer / Underdrain Re-Inspections |
Special Use Permit Fees |
|
Category C - Agricultural uses not related to farming or permitted agricultural uses; temporary public facilities; other limited uses not necessarily commercial in nature
|
Category C - Agricultural uses not related to farming or permitted agricultural uses; temporary public facilities; other limited uses not necessarily commercial in nature |
Category D - Non-commercial and commercial uses of minimal impact or intensity.
|
Category D - Non-commercial and commercial uses of minimal impact or intensity. |
Category E - Commercial uses with intensity that is semi-compatible with surrounding uses with relatively few design mitigation measures
|
Category E - Commercial uses with intensity that is semi-compatible with surrounding uses with relatively few design mitigation measures
|
Category G - Greater intensity commercial activities, and activities of potentially greater off-site impacts (traffic, noise, lighting, etc.) |
Category G - Greater intensity commercial activities, and activities of potentially greater off-site impacts (traffic, noise, lighting, etc.)
|
The exact amount should be used when calculating payments for land development review(s) and permit fees when submitted as part of the application process. If there is a miscalculation of fees by less than 20 percent and the plan meets quality control screening standards, the Department of Development Services will accept the plans and adjust the amount by the final submission (signature submission).
Any fees calculated on an area basis must be figured to a minimum of two decimal places. For example, if the parcel area is 8.49956 ac, do not use 8.4 ac or 8.5 ac, 8.50 ac should be used to calculate the fees.
Payment can be made using cash, checks, or credit/debit cards for all land development review(s) and permit fees. However, credit card payments for bonds and/or escrows (including lot escrows) will not be accepted (cash or separate check only). Checks should be made payable to ‘Director of Finance, Prince William County'. Only the following credit/debit cards will be accepted for land development fees: Master Card, Visa, and Discover.
See Land Development Documents or Forms Permits and Applications for the necessary application forms.